亚洲精品久久7777777,综合人妻久久一区二区精品,亚洲最大av一区二区三区,免费无码又爽又刺激聊天app,精品国精品无码自拍自在线,老司机久久99久久精品播放免费,亚洲一区二区三区自拍公司,亚洲日本高清成人aⅴ片
Welcome to Dongguan Haochen Hot Runner Technology Co., Ltd!
中文    EN

Haochen 20 years of focus on multimode cavities and small spacing hot runner

Service /


Mobile: 13712972461
Tel: 0769-85478528
400-0988-117
Fax: 0769-85478508
Email: sales@hostar888.com
Website: www.hanfu78.cn
Address: No. 11 Zhenlang Road, Wusha Caiwu Industrial Second Road, Chang'an Town, Dongguan City
Company NewsYour location: Home > News > Company News

Analysis of Precautions for Hot Runner Temperature Control Box

Publisher: Administrator Date: 2023-11-02

The hot runner temperature control box should be checked according to safety precautions before use, and the equipment should be turned on after confirmation. So what exactly should be confirmed before use?

1. Check if the thermocouple type on the mold and the thermocouple set on the temperature control card are consistent, that is, "J" or "K" type, which must be consistent.

2. Check if the wiring method of the hot runner on the mold is consistent with the wiring method of the junction box on the temperature control box, especially if the positive and negative poles of the thermocouple are consistent.

3. Check if the equipped cable is suitable for this temperature control box, if the junction box matches, and if the wires and thermocouple wires inside match.

4. Check if the input power cord wiring of the temperature control box is correct.

5. Check the resistance and insulation of the hot runner heater, and then check whether the thermocouple of the hot runner temperature control box is short circuited or open circuited.

6. Connect the cable after the mold is installed on the injection molding machine.

7. Check if the main power switch of the temperature control box and each set of switches are closed. All switches should be closed in advance to avoid burning the thermocouple of the temperature control box or hot runner if the power is connected incorrectly.

8. Check if the input power supply connected to the temperature control box is suitable for the temperature control box, and then connect the cable.

9. Ensure that the grounding wire of the temperature control box is securely connected.

10. Turn on the main power switch.

11. Opening a single set of switches: First, open one set, and then gradually open another set to ensure that if the wrong wire is connected, only one set of temperature control cards or one set of thermocouples will be burned. If there is abnormal sound or display, please do not continue to open other temperature control cards, and immediately check the wiring of each part.

12. Set each group to the desired temperature.

13. Check if the required temperature and stability have been reached.

14. Attention: When unplugging and inserting the temperature control card, be sure to first turn off the power supply of the temperature control box. hot runner system



Dongguan Haochen Hot Runner Technology Co., Ltd
Contact Us:
Mobile: 13712972461
Tel: 0769 85478528/400 0988 117
Fax: 0769-85478508
Email: sales@hostar888.com
Website: www.hanfu78.cn
Address: No. 11 Zhenlang Road, Wusha Caiwu Industrial Second Road, Chang'an Town, Dongguan City

粵ICP備18086307號
CopyRight ? 2023 Dongguan Haochen Hot Runner Technology Co., Ltd. All Right Reserved.

Online
Service

ConsultationTime:9:00-18:00

Select customer service:

Hot
Line

400-0988-117
7*24H Service

Follow
Us

Website
TOP
主站蜘蛛池模板: 亚洲人成网线在线播放va| 国产精品久久久久电影院| 2020久久香蕉国产线看观看| 国产第一页屁屁影院| 五十路熟妇亲子交尾| 国产精品a久久777777| 中文字幕人妻无码一夲道| 亚洲色大成网站www永久男同| 亚洲人成色77777在线观看大战p| 久久久久人妻一区精品色| 亚洲中文字幕永久在线全国| 中文字幕日韩精品一区二区三区| 日产一区日产2区| 亚洲人成人77777网站| 亚洲熟女乱色综合亚洲小说| 欧美熟妇另类久久久久久不卡| 日本少妇高潮喷水视频| 国偷自产一区二区免费视频| 996久久国产精品线观看| 亚洲精品55夜色66夜色| 国产亚洲精品久久久久久国| 国产精品污www一区二区三区 | 久久精品女人天堂av麻| 国产亚洲色欲色一色www| 无码免费伦费影视在线观看| 国内精品久久久久影院蜜芽| 久久久橹橹橹久久久久高清| 国产黑色丝袜在线观看片不卡顿| 国产精品a久久777777| 亚洲欧美日本韩国| 精品国产精品久久一区免费式| 国产手机在线亚洲精品观看| 国产精品无码制服丝袜| 无码精品a∨在线观看十八禁| 亚洲a∨天堂男人无码| 伊人久久大香线蕉av仙人 | 国产精品污www一区二区三区| 五十路熟妇亲子交尾| 韩国的无码av看免费大片在线| 欧美牲交videossexeso欧美| 97无码免费人妻超级碰碰夜夜|