Industry NewsYour location: Home > News > Industry News

How to complete the hot runner mold trial in 8 steps

Publisher: Administrator Date: 2023-11-02

Hot runner mold trial 8 steps

Step 1. Set the temperature of the bucket

It should be noted that the initial barrel temperature setting must be based on the recommendation of the material supplier. This is because different manufacturers and brands of the same material may have significant differences, and material suppliers often have their own

Considerable in-depth research and understanding. Users can make basic settings based on their recommendations, and then make appropriate adjustments according to the specific production situation.

In addition, a detector is also required to measure the actual temperature of the melt. Because the barrel temperature we set often cannot guarantee 100% consistency with the melt temperature due to differences in environment, temperature sensor model, and location depth.

Sometimes, due to the presence of oil stains or other reasons, the actual temperature of the melt and the set temperature of the material barrel differ greatly (previously, we had examples where the temperature difference between the two was as high as 30 ℃).

Step 2. Set the temperature of the mold

Similarly, the initial mold temperature setting must also be based on the recommended values provided by the material supplier.

It should be noted that the mold temperature we refer to refers to the surface temperature of the mold cavity, rather than the temperature displayed on the mold temperature controller. Many times, due to environmental factors and improper power selection of the mold temperature controller, the display on the mold temperature controller

The temperature is not consistent with the surface temperature of the mold cavity. Therefore, before the formal trial mold, the temperature of the mold cavity surface must be measured and recorded. At the same time, measurements should also be taken at different positions in the mold cavity to check if the temperature at each point is balanced,

And record the corresponding results to provide reference data for subsequent mold optimization.

Step 3

Based on experience, preliminarily set parameters such as plasticizing amount, injection pressure limit, injection speed, cooling time, and screw speed, and optimize them appropriately.

Step 4. Conduct a filling test to identify the transition points.

The transition point refers to the transition point from the injection stage to the pressure maintaining stage, which can include screw position, filling time, and filling pressure. This is one of the most important and fundamental parameters in the injection molding process. In actual filling tests, the following points need to be followed:

(1) The holding pressure and holding time during the test are usually set to zero;

(2) The product is generally filled to 90%~98%, depending on the wall thickness and the structural design of the mold;

(3) Due to the impact of injection speed on the position of the transfer point, it is necessary to reconfirm the transfer point every time the injection speed is changed.

Through filling experiments, users can see the flow path of the material in the mold cavity, thereby determining where the mold is prone to air trapping or where exhaust needs to be improved.

Step 5. Find the limit value of injection pressure.

During this process, attention should be paid to the relationship between injection pressure and injection speed. For hydraulic systems, pressure and speed are interrelated. Therefore, it is not possible to set both parameters simultaneously to meet the required conditions.

The injection pressure set on the screen is the limit value of the actual injection pressure, therefore, the limit value of the injection pressure should be set to always be greater than the actual injection pressure. If the injection pressure limit is too low, causing the actual injection pressure to approach or exceed the injection pressure

By limiting the value, the actual injection speed will automatically decrease due to power limitations, thereby affecting the injection time and molding cycle.

Step 6. Find the optimized injection speed.

The injection speed referred to here refers to an injection speed that simultaneously minimizes the filling time and minimizes the filling pressure. During this process, the following points need to be noted:

(1) Most surface defects of products, especially those near the gate, are caused by injection speed.

(2) Multi stage injection is only used when one injection cannot meet the process requirements, especially during the mold trial stage.

(3) When the mold is intact, the pressure transfer point is set correctly, and the injection speed is sufficient, the speed of injection is not directly related to the generation of flash.

Step 7. Optimize the holding time.

The holding time is also the condensation time of the gate. Generally, the condensation time of the gate can be determined by weighing to obtain different holding times, and the optimal holding time is the time when the product mold weight reaches its maximum.

Step 8. Optimize other parameters, such as holding pressure and locking force.

Finally, it should be emphasized that the purpose and focus of the trial mold is to optimize the mold and process to meet the requirements of mass production, rather than just testing out good product samples.



Dongguan Haochen Hot Runner Technology Co., Ltd
Contact Us:
Mobile: 13712972461
Tel: 0769 85478528/400 0988 117
Fax: 0769-85478508
Email: sales@hostar888.com
Website: www.hanfu78.cn
Address: No. 11 Zhenlang Road, Wusha Caiwu Industrial Second Road, Chang'an Town, Dongguan City

粵ICP備18086307號
CopyRight ? 2023 Dongguan Haochen Hot Runner Technology Co., Ltd. All Right Reserved.

Online
Service

ConsultationTime:9:00-18:00

Select customer service:

Hot
Line

400-0988-117
7*24H Service

Follow
Us

Website
TOP
主站蜘蛛池模板: 久久丫免费无码一区二区| 四库影院永久国产精品| 亚洲欧美日韩一区二区| 日本巨大的奶头在线观看| 夜夜添狠狠添高潮出水| 国产亚洲日韩网曝欧美台湾| 亚洲精品久久久久久久久av无码| 99久久久无码国产麻豆| 欧洲美熟女乱av亚洲一区| 九九视频免费精品视频| 亚洲精品字幕| 国产私拍福利精品视频| 欧美国产日韩在线三区| 亚洲成av人影院| 狠狠色婷婷丁香综合久久| 98国产精品综合一区二区三区| 人妻去按摩店被黑人按中出| 国产成人精品成人a在线观看| 黑人猛挺进小莹的体内视频| av无码一区二区大桥未久| 国产极品美女到高潮| 久久天天躁狠狠躁夜夜爽| 天天影视网天天综合色| 亚洲精品国产第一区第二| 手机国产乱子伦精品视频| 成 人色 网 站 欧美大片在线观看| 亚洲 欧洲 无码 在线观看| 亚洲国产精品久久艾草纯爱| 在教室伦流澡到高潮hnp视频| 国产精品日日做人人爱| 一二三四视频社区在线| 精品国产av一区二区果冻传媒| 国产夫妇肉麻对白| 精品国产va久久久久久久冰| 人人爽人人爽人人片a∨| 国产私拍福利精品视频| 看国产一毛片在线看手机看 | 99热精品久久只有精品| 亚洲人成人77777网站| 国产手机在线亚洲精品观看| 狠狠色噜噜狠狠狠狠777米奇|