<p id="y1mij"></p>

    1. <td id="y1mij"></td>

        <noscript id="y1mij"><tbody id="y1mij"></tbody></noscript>
        <td id="y1mij"></td>

        亚洲精品久久7777777,综合人妻久久一区二区精品,亚洲最大av一区二区三区,免费无码又爽又刺激聊天app,精品国精品无码自拍自在线,老司机久久99久久精品播放免费,亚洲一区二区三区自拍公司,亚洲日本高清成人aⅴ片
        Welcome to Dongguan Haochen Hot Runner Technology Co., Ltd!
        中文    EN

        Haochen 20 years of focus on multimode cavities and small spacing hot runner

        Service /


        Mobile: 13712972461
        Tel: 0769-85478528
        400-0988-117
        Fax: 0769-85478508
        Email: sales@hostar888.com
        Website: www.hanfu78.cn
        Address: No. 11 Zhenlang Road, Wusha Caiwu Industrial Second Road, Chang'an Town, Dongguan City
        Industry NewsYour location: Home > News > Industry News

        How to complete the hot runner mold trial in 8 steps

        Publisher: Administrator Date: 2023-11-02

        Hot runner mold trial 8 steps

        Step 1. Set the temperature of the bucket

        It should be noted that the initial barrel temperature setting must be based on the recommendation of the material supplier. This is because different manufacturers and brands of the same material may have significant differences, and material suppliers often have their own

        Considerable in-depth research and understanding. Users can make basic settings based on their recommendations, and then make appropriate adjustments according to the specific production situation.

        In addition, a detector is also required to measure the actual temperature of the melt. Because the barrel temperature we set often cannot guarantee 100% consistency with the melt temperature due to differences in environment, temperature sensor model, and location depth.

        Sometimes, due to the presence of oil stains or other reasons, the actual temperature of the melt and the set temperature of the material barrel differ greatly (previously, we had examples where the temperature difference between the two was as high as 30 ℃).

        Step 2. Set the temperature of the mold

        Similarly, the initial mold temperature setting must also be based on the recommended values provided by the material supplier.

        It should be noted that the mold temperature we refer to refers to the surface temperature of the mold cavity, rather than the temperature displayed on the mold temperature controller. Many times, due to environmental factors and improper power selection of the mold temperature controller, the display on the mold temperature controller

        The temperature is not consistent with the surface temperature of the mold cavity. Therefore, before the formal trial mold, the temperature of the mold cavity surface must be measured and recorded. At the same time, measurements should also be taken at different positions in the mold cavity to check if the temperature at each point is balanced,

        And record the corresponding results to provide reference data for subsequent mold optimization.

        Step 3

        Based on experience, preliminarily set parameters such as plasticizing amount, injection pressure limit, injection speed, cooling time, and screw speed, and optimize them appropriately.

        Step 4. Conduct a filling test to identify the transition points.

        The transition point refers to the transition point from the injection stage to the pressure maintaining stage, which can include screw position, filling time, and filling pressure. This is one of the most important and fundamental parameters in the injection molding process. In actual filling tests, the following points need to be followed:

        (1) The holding pressure and holding time during the test are usually set to zero;

        (2) The product is generally filled to 90%~98%, depending on the wall thickness and the structural design of the mold;

        (3) Due to the impact of injection speed on the position of the transfer point, it is necessary to reconfirm the transfer point every time the injection speed is changed.

        Through filling experiments, users can see the flow path of the material in the mold cavity, thereby determining where the mold is prone to air trapping or where exhaust needs to be improved.

        Step 5. Find the limit value of injection pressure.

        During this process, attention should be paid to the relationship between injection pressure and injection speed. For hydraulic systems, pressure and speed are interrelated. Therefore, it is not possible to set both parameters simultaneously to meet the required conditions.

        The injection pressure set on the screen is the limit value of the actual injection pressure, therefore, the limit value of the injection pressure should be set to always be greater than the actual injection pressure. If the injection pressure limit is too low, causing the actual injection pressure to approach or exceed the injection pressure

        By limiting the value, the actual injection speed will automatically decrease due to power limitations, thereby affecting the injection time and molding cycle.

        Step 6. Find the optimized injection speed.

        The injection speed referred to here refers to an injection speed that simultaneously minimizes the filling time and minimizes the filling pressure. During this process, the following points need to be noted:

        (1) Most surface defects of products, especially those near the gate, are caused by injection speed.

        (2) Multi stage injection is only used when one injection cannot meet the process requirements, especially during the mold trial stage.

        (3) When the mold is intact, the pressure transfer point is set correctly, and the injection speed is sufficient, the speed of injection is not directly related to the generation of flash.

        Step 7. Optimize the holding time.

        The holding time is also the condensation time of the gate. Generally, the condensation time of the gate can be determined by weighing to obtain different holding times, and the optimal holding time is the time when the product mold weight reaches its maximum.

        Step 8. Optimize other parameters, such as holding pressure and locking force.

        Finally, it should be emphasized that the purpose and focus of the trial mold is to optimize the mold and process to meet the requirements of mass production, rather than just testing out good product samples.



        Dongguan Haochen Hot Runner Technology Co., Ltd
        Contact Us:
        Mobile: 13712972461
        Tel: 0769 85478528/400 0988 117
        Fax: 0769-85478508
        Email: sales@hostar888.com
        Website: www.hanfu78.cn
        Address: No. 11 Zhenlang Road, Wusha Caiwu Industrial Second Road, Chang'an Town, Dongguan City

        粵ICP備18086307號
        CopyRight ? 2023 Dongguan Haochen Hot Runner Technology Co., Ltd. All Right Reserved.

        Online
        Service

        ConsultationTime:9:00-18:00

        Select customer service:

        Hot
        Line

        400-0988-117
        7*24H Service

        Follow
        Us

        Website
        TOP
        主站蜘蛛池模板: 午夜福利一区二区三区在线观看| 国产精品a久久777777| 欧美熟妇另类久久久久久不卡| 亚洲狠狠婷婷综合久久久久图片| 亚洲欧美日本韩国| 少妇被粗大的猛进69视频| 国产精品欧美亚洲韩国日本久久 | 妺妺窝人体色www在线小说| 无码免费伦费影视在线观看| 国产成人综合亚洲亚洲国产第一页| 日本最新高清一区二区三| 国产乱人伦中文无无码视频试看| 狼群社区www中文视频| 神马影院午夜dy888| 四库影院永久国产精品 | 少妇被爽到高潮动态图| 亚洲欧美日韩一区二区| 亚洲欧美日韩一区二区| 亚洲高清成人aⅴ片777| 亚洲精品国产第一区第二| 欧美成人看片一区二区| 亚洲va在线∨a天堂va欧美va| 精品少妇ay一区二区三区| 大伊香蕉精品一区视频在线| 欧美又大粗又爽又黄大片视频| 国产精品a国产精品a手机版| 欧美精品亚洲精品日韩传电影| 国产女精品视频网站免费| 中文字幕无码肉感爆乳在线| 国产精品无码制服丝袜| 精品国产亚洲一区二区三区在线观看| 一本久道中文无码字幕av| 蜜桃视频一区二区三区在线观看| 亚洲国产日韩在线人高清| 亚洲色无码一区二区三区| 国产精品麻豆va在线播放| 亚洲a∨天堂男人无码| 中文字幕日产无码| 成人无码区免费视频网站| 无码日韩av一区二区三区| 蜜桃视频一区二区三区在线观看|