<p id="y1mij"></p>

    1. <td id="y1mij"></td>

        <noscript id="y1mij"><tbody id="y1mij"></tbody></noscript>
        <td id="y1mij"></td>

        亚洲精品久久7777777,综合人妻久久一区二区精品,亚洲最大av一区二区三区,免费无码又爽又刺激聊天app,精品国精品无码自拍自在线,老司机久久99久久精品播放免费,亚洲一区二区三区自拍公司,亚洲日本高清成人aⅴ片
        Welcome to Dongguan Haochen Hot Runner Technology Co., Ltd!
        中文    EN

        Haochen 20 years of focus on multimode cavities and small spacing hot runner

        Service /


        Mobile: 13712972461
        Tel: 0769-85478528
        400-0988-117
        Fax: 0769-85478508
        Email: sales@hostar888.com
        Website: www.hanfu78.cn
        Address: No. 11 Zhenlang Road, Wusha Caiwu Industrial Second Road, Chang'an Town, Dongguan City
        Industry NewsYour location: Home > News > Industry News

        How much do you know about hot runner installation?

        Publisher: Administrator Date: 2023-11-02

        The heating module system in the mold cavity hot runner mold is a new type of structure that heats the flow channels and channels of traditional molds or three-piece molds, without the need to remove the flow channels and channels during each forming process. A typical hot runner system consists of the following components: main splitter plate, nozzle (NOZZLE), temperature controller, and auxiliary components.

        The following also summarizes some precautions for installing hot runners:

        1. Organize the mold, put down the upper mold, and clean all holes and templates.

        2. Check the size and depth of each hole. Remove burrs from the template. At the same time, check whether the screw holes, center nails, and anti rotation pin holes of the ram have been processed.

        3. Scan red lead at the hot nozzle sealing position and the upper step position to match the mold.

        4. Test the hot head, then remove it and check if the 1st level sealant is in contact with the red lead, and if the 2nd level step is in contact with the mold. If not, please stop the installation and check for incorrect adjustments. Ensure tight fit and no leakage. Be careful not to get hurt during this process.

        5. Install all hot nozzles while installing center pads, center pins, and anti transfer pins. Sweep red lead onto its surface.

        6. Check the mouth position and center pad height, and control the error within 0.05mm.

        7. Install the partition. Pay attention to the formal installation of the partition and avoid missing the hot nozzle sealing ring.

        8. Check the fit between the splitter plate and the hot nozzle to ensure that all splitter plates and hot nozzles are in contact with red lead and there is no leakage of adhesive.

        9. Arrange the wiring of the heat pipe nozzle to make it neat and aesthetically pleasing, and number each group of wires in sequence. Connect the line to the socket.

        10. Place the separator plate into the assembly, lock the fixing screws of the splitter plate (pay attention to locking and balancing, so that the four corners of the splitter plate are consistent), and control the meson of the splitter plate to be higher than the surrounding area. The mold base plane is 0.10-0.15mm, and then the red lead is scanned onto the splitter plate meson.

        11. Test the code template, check if the plane contacts the meson red line, and ensure that the template presses down on the splitter board meson.

        12. Lock the mold, erect the mold, and check whether the matching between the gate and the end meets the requirements from the parting surface. It should be 0.1-0.2 millimeters lower than the surface of the main channel and should not tilt the center. Carefully check each circuit with a multimeter to ensure that there are no short circuits, open circuits, leakage or other phenomena in each circuit, and that each circuit corresponds correctly to ensure that each circuit is normal. Connect a thermostat for heating testing. Heating should be done within a 100 degree range for 10 minutes to preheat and dehumidify, protecting the heater. Then we heat it to the required temperature, and if you can arrange for the lifting mold to be tested normally.



        Dongguan Haochen Hot Runner Technology Co., Ltd
        Contact Us:
        Mobile: 13712972461
        Tel: 0769 85478528/400 0988 117
        Fax: 0769-85478508
        Email: sales@hostar888.com
        Website: www.hanfu78.cn
        Address: No. 11 Zhenlang Road, Wusha Caiwu Industrial Second Road, Chang'an Town, Dongguan City

        粵ICP備18086307號
        CopyRight ? 2023 Dongguan Haochen Hot Runner Technology Co., Ltd. All Right Reserved.

        Online
        Service

        ConsultationTime:9:00-18:00

        Select customer service:

        Hot
        Line

        400-0988-117
        7*24H Service

        Follow
        Us

        Website
        TOP
        主站蜘蛛池模板: 蜜臀av色欲a片无码精品一区| 色婷婷亚洲精品综合影院| 色婷婷亚洲精品综合影院| 黄页网站18以下勿看| 人妻 色综合网站| 9l国产精品久久久久尤物| 久久男人av资源站| 在线看免费无码av天堂| 少妇被粗大的猛进69视频| 精品精品国产欧美在线小说区| 国产精品久久国产精品99 gif| 亚洲色偷偷色噜噜狠狠99网| 国产a∨天天免费观看美女| 狼群社区www中文视频 | 小雪尝禁果又粗又大的视频| 国产午夜福利在线播放| 98视频精品全部国产| 狠狠色噜噜狠狠狠狠888奇米| 欧美牲交videossexeso欧美| 高潮毛片无遮挡高清视频播放 | 欧美熟妇另类久久久久久不卡| 国产精品日日做人人爱| 精品国产综合区久久久久久| 欧美日韩视频无码一区二区三| 精品国产乱码久久久久久浪潮小说| 狼群社区www中文视频| 免费看国产曰批40分钟| 亚洲依依成人综合网址| 成 人色 网 站 欧美大片在线观看| 久久精品国产曰本波多野结衣 | 浪荡女天天不停挨cao日常视频| 亚洲色无码播放亚洲成av| 亚洲精品尤物av在线观看不卡| 人妻无码人妻有码中文字幕在线| 麻豆精品偷拍人妻在线网址| 人妻精品久久久久中文字幕69| 国产内射一区亚洲| 国产精品一区二区久久不卡| 国产精品久久久久电影院| 国产精品美女久久久久久2021| 久久国产精久久精产国|